866-997-4948(US-Canada Toll Free)

Project Insight - Tunnel Construction Projects: Middle East and Africa

Published By :

Timetric

Published Date : Aug 2017

Category :

Construction

No. of Pages : 22 Pages

Synopsis
The report provides detailed market analysis, information and insights based on almost 40 CIC projects in the Miiddle East and Africa market. The report provides detailed metrics on the region's tunnel related construction projects (as tracked by CIC) split by country, type and value. Detailed metrics are also provided for the top 10 countries.

Summary
Timetrics Construction Intelligence Center (CIC) is currently tracking healthcare construction projects in The Middle East and Africa with a total value of US$133.4 billion, which includes projects from the announced to execution stages. Qatar accounts for the highest value of the project pipeline, with a value of US$41.2 billion, followed by Saudi Arabia with projects valued at US$36.9 billion. Egypt and Israel with projects valued at US$18.0 billion and US$11.1 billion respectively.



Scope
The report provides analysis based on CIC projects showing total project values for the Middle East and Africa market and analysis by stage and funding for the top ten countries. Top project listings and top participants for the sector are also shown. Tunnel length and tunnel method eg tunnel boring machine is provided if known.

Reasons To Buy
Providing insight into main drivers of activity and forecasts, providing an understanding of key trends, analysis of projects by value for the Middle East and Africa market and main countries enabling clients to target products and services for each type of project. Analysis of main projects participants by value for the sector enabling clients to target products and services for each type of project. Providing top projects data with location, value, stage and start date.

Key Highlights
The overall projects pipeline is led by the execution stage, with a total value of US$98.1 billion, followed by projects in planning with US$21.9 billion. Projects in the pre-execution stage amount to US$13.3 billion while there are no projects tracked in the pre-planning stage.
Table of Contents
1. Regional Overview
2. Key Operators
3. Project Analytics by Country
3.1. Qatar
3.2. Saudi Arabia
3.3. Egypt
3.4. Israel
3.5. Algeria
3.6. Kuwait
3.7. Iran
3.8. The UAE
3.9. Tanzania
3.10. Reunion
4. Methodology
5. Disclaimer



List of Tables
Table 1: MEA - Tunnel Construction Project Pipeline, Value by Country and Stage (US$ million)
Table 2: Top 50 Tunnel Projects by Value
Table 3: Key Contractors - Value of Projects
Table 4: Key Consulting Engineers - Value of Projects
Table 5: Key Project Owners - Value of Projects


List of Figures
Figure 1: MEA - Tunnel Construction Project Pipeline, All Countries Value by Stage (US$ million)
Figure 2: MEA - Tunnel Construction Project Pipeline, All Countries Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 3: MEA - Tunnel Construction Project Pipeline, Top 10 Countries (US$ million)
Figure 4: MEA - Tunnel Construction Project Pipeline, Top 10 Countries by Stage (US$ million)
Figure 5: MEA - Tunnel Construction Project Pipeline, Top 10 Countries Projected Annual Spending by Stage (US$ million)
Figure 6: MEA - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 7: MEA - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 8: MEA - Tunnel Construction Project Pipeline, Length by Stage (Km)
Figure 9: MEA - Tunnel Construction Project Pipeline, Top 10 Countries by Stage (Km)
Figure 10: Qatar - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 11: Qatar - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 12: Qatar - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 13: Qatar - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 14: Saudi Arabia - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 15: Saudi Arabia - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 16: Saudi Arabia - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 17: Saudi Arabia - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 18: Egypt - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 19: Egypt - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 20: Egypt - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 21: Egypt - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 22: Israel - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 23: Israel - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 24: Israel - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 25: Israel - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 26: Algeria - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 27: Algeria - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 28: Algeria - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 29: Algeria - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 30: Kuwait - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 31: Kuwait - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 32: Kuwait - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 33: Iran - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 34: Iran - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 35: Iran - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 36: Iran - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 37: The UAE - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 38: The UAE - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 39: The UAE - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 40: The UAE - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 41: Tanzania - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 42: Tanzania - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 43: Tanzania - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 44: Tanzania - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 45: Reunion - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 46: Reunion - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 47: Reunion - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)

Make an enquiry before buying this Report

Please fill the enquiry form below.

  • Full Name *
  • Your Email *
  • Job Title *
  • Company *
  • Phone No. * (Pls. Affix Country Code)
  • Message
  • Security Code *